Lewis University Airport Rehabilitation was the reconstruction of 3200 lineal feet of Runway 9/27 East. The work consisted of the excavation of the existing runway, replacement of stone sub-base, replacement of asphalt pavements with the addition of an asphalt friction course and striping of the runway.
Client: Illinois Department of Transportation
Asphalt: 13,667 tons