This project targeted a distribution center for FedEx. Project was performed with Meridian Design Build (consulting engineers). Project consisted of 53,725 tons of stone, which Gallagher placed using a new John Deere high-speed dozer with Topcon GPS technology.
Client: FedEx Corporation
Asphalt: 28,410 tons
Stone: 53,725 tons