This project was a complete site asphalt paving project for all automobile and truck parking areas. The construction schedule called for a very quick turnaround with all work being completed in 20 working days or less. The general contractor was under major pressure from the owner, and Gallagher did everything they could to deliver on time. The scope of work included a 1 ½” surface overlay in the existing employee parking lot and 6” of heavy duty asphalt in the trucking areas, with stone base re-grading and compacting prior to re-paving of the lots. Gallagher faced challenges in creating and producing the required N50 and N90 polymerized mixes for the owner, but as they always do, Gallagher found a way to get it done to the satisfaction and approval of the Client.
Client: Costco
Hotmix: 25,904 Tons
Stone: 994 Tons