• slidebg1
  • slidebg2
  • slidebg3
  • slidebg3
  • slidebg3

Building 8 Improvements

Elwood, IL

Gallagher milled out 2” of existing asphalt pavement across the entire lot, and installed a new 2” asphalt surface course. Gallagher also constructed a new roadway connecting the south side of the property, and will be constructing a new entrance on the north side of the property. Concrete aprons, curbs, dolly pads, and other miscellaneous concrete pads were installed. Gallagher followed up by re-striping the entire property and installing new roadway signage where required.

Client: MHC
Asphalt: 13,4470 Tons
Stone: 3,190 Tons
Concrete: 310 CYs

Next Project  |  Last Project