Target

Target - Joliet

Joliet, IL

This project was located at 2701 Plainfield Road in Joliet, Illinois and consisted of 4 phases of hot mix asphalt pavement removal and replacement for the parking lot reconstruction. The total grinding area for the removal was 24,453 square yards, and the total hot mix asphalt tonnage for the replacement was 4,920 tons. Lime stabilization to the sub-base and parking lot striping and signage were also included in Gallagher’s scope of work.

Client: Target Corporation
Grinding Area: 24,453 square yards
Hot Mix Asphalt: 4,920 tons