CAP Barbell

CAP Barbell Distribution Facility

Joliet, IL

This project was located at 3501 Corporate Drive in Joliet, Illinois. The project consisted of a total pavement area of 18,800 square yards with 5,705 tons of hot mix asphalt being placed onsite. Construction of an hot mix asphalt bike path and parking lot striping and signage were also included in Gallagher’s scope of work.

Client: CAP Barbell
Total Area: 18,800 square yards
Hot Mix Asphalt: 5,705 tons